Optimizing Coating Board Project Line Performance: Key Equipment Parameters and Solutions | Leizhan

Coating Board Project Line: Energy Efficiency and Cost Optimization

The coating board project production line requires carefully integrated equipment to achieve optimal performance. Modern systems from Zhengzhou Leizhan Technology incorporate advanced process control, energy-efficient components, and robust construction for reliable 24/7 operation.

Core Equipment: Fractionation Screen

Separates long fiber (>1.2mm) from short fiber, capacity 100-300 TPD, slot/hole combination baskets.

This equipment plays a critical role in the coating-case line by optimizes fiber utilization by grade. Mills upgrading to this technology report reducing chemical consumption by 10-15% through optimized process control.

Raw Material Flexibility and Grade Changes

Beyond individual equipment performance, the integration between processing stages determines overall line efficiency. The coating board project system is designed as a complete solution where each stage is sized for balanced throughput.

Supplementary Equipment: Disc Thickener

Inlet consistency 0.8-1.2%, discharge 8-12%, disc diameter 2500-3500 mm, water removal 3-5 tons/hour.

When paired with the primary equipment, the Disc Thickener delivers energy-efficient dewatering with minimal fiber loss, achieving 20% lower specific energy consumption compared to conventional designs.

Contact Leizhan for Coating Board Project Solutions

Zhengzhou Leizhan Technology provides complete equipment solutions for paper mills worldwide. Engineering support covers process design through commissioning and optimization.

Email: leizhanzhang@gmail.com

post a comment