Coating Board Project Line: Raw Material Flexibility and Grade Changes

The coating board project production line requires carefully integrated equipment to achieve optimal performance. Modern systems from Zhengzhou Leizhan Technology incorporate advanced process control, energy-efficient components, and robust construction for reliable 24/7 operation.

Core Equipment: Low Density Cleaner System

Operating consistency 0.6-1.2%, pressure drop 1.2-1.8 bar, lightweight contaminant removal above 90%.

This equipment plays a critical role in the coating-case line by superior stickies and plastic removal. Mills upgrading to this technology report achieving 20% lower specific energy consumption compared to conventional designs.

Maintenance Best Practices and Service Intervals

Beyond individual equipment performance, the integration between processing stages determines overall line efficiency. The coating board project system is designed as a complete solution where each stage is sized for balanced throughput.

Supplementary Equipment: Flotation Deinking Cell

Capacity 50-120 TPD per cell, ink removal 85-92%, brightness gain 10-15 points ISO, air-to-stock ratio 0.3-0.5.

When paired with the primary equipment, the Flotation Deinking Cell delivers achieves iso brightness above 90% for cultural paper, enabling 100% recycled fiber processing without compromising paper strength.