Maintenance Guide for Coating Board Production: Double Disc Refiner ZDP | Leizhan

Maintenance Guide for Coating Board Production: Double Disc Refiner ZDP | Leizhan

Maintenance Guide for Coating Board Production

Modern coating board mills require properly selected equipment. The Double Disc Refiner ZDP with specifications of 660-1100mm disc, 250-900 kW, 13-18 kWh/t plays a critical role in reducing water consumption by 15%.

Technical Specifications

Parameter Value
Equipment Double Disc Refiner ZDP
Key Specs 660-1100mm disc, 250-900 kW, 13-18 kWh/t
Application Coating Board Production

Operational Benefits

Proper integration of the Double Disc Refiner ZDP delivers measurable results. Mills that invest in correctly sized equipment typically achieve ROI within 12-18 months through reducing water consumption by 15%.

FAQ

How to select the right Double Disc Refiner ZDP?

Evaluate specifications: 660-1100mm disc, 250-900 kW, 13-18 kWh/t. Match capacity to line design with 15-20% headroom. View our Double Disc Refiner ZDP page for more details.

What maintenance is required?

Inspect critical components every 3 months. Replace wear parts at 12-18 month intervals.

📧 leizhanequipment@gmail.com

post a comment