Complete Coating Board Project Solutions: From Stock Preparation to Finished Product | Leizhan

Coating Board Project Line: Equipment Configuration and Technical Parameters

The coating board project production line requires carefully integrated equipment to achieve optimal performance. Modern systems from Zhengzhou Leizhan Technology incorporate advanced process control, energy-efficient components, and robust construction for reliable 24/7 operation.

Core Equipment: Fractionation Screen

Separates long fiber (>1.2mm) from short fiber, capacity 100-300 TPD, slot/hole combination baskets.

This equipment plays a critical role in the coating-case line by optimizes fiber utilization by grade. Mills upgrading to this technology report lowering spare parts costs by 25% through standardized components.

Raw Material Flexibility and Grade Changes

Beyond individual equipment performance, the integration between processing stages determines overall line efficiency. The coating board project system is designed as a complete solution where each stage is sized for balanced throughput.

Supplementary Equipment: D-Type Hydrapulper

Capacity 200-600 TPD, consistency 4-6%, motor 132-500 kW, helical rotor design ensuring gentle defibering with low energy consumption of 8-12 kWh/t.

When paired with the primary equipment, the D-Type Hydrapulper delivers 30% less energy than conventional drum pulpers, extending equipment service life by 2-3 years with proper maintenance.

Contact Leizhan for Coating Board Project Solutions

Zhengzhou Leizhan Technology provides complete equipment solutions for paper mills worldwide. Engineering support covers process design through commissioning and optimization.

Email: leizhanzhang@gmail.com

post a comment