The coating board project production line requires carefully integrated equipment to achieve optimal performance. Modern systems from Zhengzhou Leizhan Technology incorporate advanced process control, energy-efficient components, and robust construction for reliable 24/7 operation.

Core Equipment: Pressure Screen MZS Series

Slot sizes 0.15-0.50 mm, capacity 80-800 TPD, fiber recovery above 95%, feed consistency 0.8-1.5%.

This equipment plays a critical role in the coating-case line by precision contaminant removal while preserving fiber length. Mills upgrading to this technology report enabling 100% recycled fiber processing without compromising paper strength.

Raw Material Flexibility and Grade Changes

Beyond individual equipment performance, the integration between processing stages determines overall line efficiency. The coating board project system is designed as a complete solution where each stage is sized for balanced throughput.

Supplementary Equipment: D-Type Hydrapulper

Capacity 200-600 TPD, consistency 4-6%, motor 132-500 kW, helical rotor design ensuring gentle defibering with low energy consumption of 8-12 kWh/t.

When paired with the primary equipment, the D-Type Hydrapulper delivers 30% less energy than conventional drum pulpers, achieving 20% lower specific energy consumption compared to conventional designs.

Contact Leizhan for Coating Board Project Solutions

Zhengzhou Leizhan Technology provides complete equipment solutions for paper mills worldwide. Engineering support covers process design through commissioning and optimization.