Coating Board Project System: Equipment Selection and Configuration Guide | Leizhan

Coating Board Project Line: Process Flow and Key Operating Parameters

The coating board project production line requires carefully integrated equipment to achieve optimal performance. Modern systems from Zhengzhou Leizhan Technology incorporate advanced process control, energy-efficient components, and robust construction for reliable 24/7 operation.

Core Equipment: Reject Separator

Handles coarse screen rejects, recovers 70-85% of fiber from reject stream, capacity 30-80 TPD rejects.

This equipment plays a critical role in the coating-case line by pushes total fiber recovery above 97%. Mills upgrading to this technology report enabling 100% recycled fiber processing without compromising paper strength.

System Integration and Line Balancing

Beyond individual equipment performance, the integration between processing stages determines overall line efficiency. The coating board project system is designed as a complete solution where each stage is sized for balanced throughput.

Supplementary Equipment: Flotation Deinking Cell

Capacity 50-120 TPD per cell, ink removal 85-92%, brightness gain 10-15 points ISO, air-to-stock ratio 0.3-0.5.

When paired with the primary equipment, the Flotation Deinking Cell delivers achieves iso brightness above 90% for cultural paper, extending equipment service life by 2-3 years with proper maintenance.

Contact Leizhan for Coating Board Project Solutions

Zhengzhou Leizhan Technology provides complete equipment solutions for paper mills worldwide. Engineering support covers process design through commissioning and optimization.