Coating Board Project Equipment: Design Considerations and Operational Best Practices | Leizhan

Coating Board Project Line: Maintenance Best Practices and Service Intervals

The coating board project production line requires carefully integrated equipment to achieve optimal performance. Modern systems from Zhengzhou Leizhan Technology incorporate advanced process control, energy-efficient components, and robust construction for reliable 24/7 operation.

Core Equipment: D-Type Hydrapulper

Capacity 200-600 TPD, consistency 4-6%, motor 132-500 kW, helical rotor design ensuring gentle defibering with low energy consumption of 8-12 kWh/t.

This equipment plays a critical role in the coating-case line by 30% less energy than conventional drum pulpers. Mills upgrading to this technology report reducing water consumption by 15-20% through closed-loop design.

Equipment Configuration and Technical Parameters

Beyond individual equipment performance, the integration between processing stages determines overall line efficiency. The coating board project system is designed as a complete solution where each stage is sized for balanced throughput.

Supplementary Equipment: Flotation Deinking Cell

Capacity 50-120 TPD per cell, ink removal 85-92%, brightness gain 10-15 points ISO, air-to-stock ratio 0.3-0.5.

When paired with the primary equipment, the Flotation Deinking Cell delivers achieves iso brightness above 90% for cultural paper, reducing annual operating costs by $50,000-120,000 on a 400 TPD line.

Contact Leizhan for Coating Board Project Solutions

Zhengzhou Leizhan Technology provides complete equipment solutions for paper mills worldwide. Engineering support covers process design through commissioning and optimization.

Email: leizhanzhang@gmail.com

post a comment